Fote Heavy Machinery
Fote is a leader in high-end mining machinery in Asia
emailsales@sinofote.com
News & Events
Home > News > News Detail

The Starting Inspections of Mobile Crusher Station

4/9/2015 5:10:10 PM4/9/2015 5:10:10 PM

Mobile crusher station needs to be inspected before starting to work. The purpose of starting inspections is to avoid the security risks and ensure the normal production of mobile crusher station. Which parts of mobile crusher station need to be inspected before starting to work? We can analyze it from the following aspects:

1. The lubrication situation

Before starting to work, the mobile crusher station needs to be inspected at first. Inspect whether the lube is normal, whether the lubricating oil is full, and whether the lubrication system leaks oil.

2. The fastening condition of connectors

Check whether the connectors are loose and whether screws are fastened.

3. Inspect the crushing chamber

There should not be any foreign matter in the crushing cavity of mobile crusher station, so before work, the crushing cavity of mobile crusher station must be cleaned.

4. Check the instrument

Before starting to work, the instrument of mobile crusher station must be checked to ensure it is accurate and in good condition and ensure that the meter indicates correctly.

5. The tension of the v-belt and spring

The v-belt and spring of mobile crusher station can not be too loose or tight during work, so before starting to work, operators must inspect the tension of the v-belt and spring to ensure the normal work of mobile crusher station.

Request a Quote

You can also send a message to us by this email sales@sinofote.com, we will reply to you within 24 hours. Now tell us your needs, there will be more favorable prices!

Product Name*
Your Name:
E-mail*
Phone:
Message:

Copyright © 2017 Fote Heavy Machinery. All rights reserved. Site Map