The material discharge of gold ore jaw crusher has a very close relationship with the yield of the equipment. What matters need to be paid attention to for the material discharge?
1. The finished products of gold ore jaw crusher should be directly put on the belt conveyor. The discharging system should be specialized in the design, manufacture and installation, which not only is convenient for the maintenance but can also prevent material falling down from the conveyor.
2. When the crushed material is discharged on belt conveyor, but the nest crusher is not powdered on, the crushed material shall not be given into the crusher.
3. Material discharge should not be hampered. If materials clog together and reach the bottom of gold ore jaw crusher, they will quickly cause the wear of the jaw and increase maintenance costs.
4. If the silo is under the gold ore jaw crusher, hopper level indicator must be installed in it. Once materials in the silo reach the high level, the gold ore jaw crusher must be stopped immediately.
5. When design a discharge port for gold ore jaw crusher, specialist must ensure that it is in accordance with the relevant national standards and has protection measures.
Copyright © 2017 Fote Heavy Machinery. All rights reserved. Site Map